Malaysian Palm Oil Board

Malaysian Palm Oil Board

Project Description

With all these pipes running along and these tanks installed under a same roof, it is crucial that the temperature inside is regulated to prevent an overheat. A cost effective solution was needed to help create an optimal environment. A 24 feet AireGard HVLS Fan was installed, providing the laboratory workers a breezy and optimal working environment.

Project Details

Client: MPOB, Kajang

Tags: HVLSfan, Laboratory